Showing posts with label Contractors. Show all posts
Showing posts with label Contractors. Show all posts

Saturday, May 29, 2021

Dinner with another friend

 

Even though I still am in contact with an ex, I don't say everything about what I do to her, and the same with her not saying everything to me.  She won last year's battle, but at a great cost to both of us.  And I think that cost is trust in the other person's motives.  

Why do I bring up the past, even in passing?

My air conditioner sleeve was being reset today, so that water condensate would drain outside instead of inside.  The ex made a comment (very true) regarding my use of the air conditioner and its use to me.  It is one of the things we can safely talk about without dredging up uncomfortable topics.  Since we got off on the wrong foot after our breakup when I talked about dating again, I don't want to talk about any of my dates with her.  Even then, I brought up FH, as this was another woman who left me with a sour taste in my mouth.

I've been chatting with a woman in New Jersey for a while, and it is time to see her in person.  Hopefully, we will get along in person over time as well as we've been getting along on the phone.  It is not the time to mention this to the ex, but not because she would object.  Instead, I would rather wait until I have a new relationship before mentioning it to the past one.  No, not to rub things in.  Instead, as part of a healing process we both need to go through.

- - - - - -

Contractor personnel was on site early in the day, and I had to let them into the place to get an idea of what they would need to do in the afternoon.  Starting around 1:15 or so, they were done with inside work around 3:15 or so, but were still working on the outside of the building after 4:45.  I can only guess what contractor will be charging for this work.  And when I do find out, I won't be mentioning it here, as this is between only the board and the contractor.

Back to the dinner....

We had agreed on a Chinese restaurant that I had gone to before.  When I got there, I found that it was open - but not for dining in.  So when my date arrived, we had to punt.  Instead of having Chinese again (I had eaten at a local Chinese joint the day before), we decided to eat at the Pizzeria next door.  Although the place was noisy, the food was good and the conversation was pleasant.  Afterwards, it was dessert at an ice cream shop down the road - another place I knew of because of TCL.

We'll see what happens with this woman.  She has a nice personality, but I'm not so sure if I'm attracted enough to get physical with her.  (And of course, I still have to reveal Marian to her....)

 


 



Monday, April 5, 2021

I wonder when this problem will be completely resolved.

I have to be careful in discussing this problem, as I am a member of the co-op's board of directors, and do not want to reveal any of the internal workings of the board.

- - - - - -

A few years back, we had a contractor erect a retaining wall to secure the land one of our buildings sits on. Once one of these walls is erected, most people take it for granted as it becomes part of the landscape. However, this is a big mistake.  People have been killed because retaining walls have failed.  In New York City, retaining walls should be inspected every 5 years by a licensed professional if they have a portion over 10 feet in height, or they face a public right of way.  If this had been done for one wall, it would likely have been repaired before failure, and Northbound traffic on the Henry Hudson Parkway below would not have been affected.

In our case, I feel that the remaining part of our retaining wall has to be replaced. This will likely add to our costs in keeping our land from eroding from under our building.  This is a critical repair, and contractors will need to work up bids for our co-op.  This takes time, as the costs of labor and material availability must factored into the total price, so that the contractor can make a profit. But there is a cost of regulation that also has to be factored into the price.  Regulations often imply "best practices" which many unlicensed firms ignore.  Given that board members act in a fiduciary capacity for a co-op, we need to make the best choice of contractor, the best choice of retaining wall options, and the best value for money spent.  The latter may be the most important consideration, as our co-op errs on the side of frugality.

Later in the morning, I did some research and sent an email with the following text to our board:

I did a search for information regarding retaining walls, and came up with this important piece of info.. New York City now requires all retaining walls that extend upwards of 10 feet OR are adjacent to a right of way to be inspected every 5 years. This was in response to the retaining wall collapse that caused the shutdown of the northbound lanes of the Henry Hudson Parkway in 2005.(?)  However, there is not much regulation outside NYC, and most of that seems to regard decorative walls and permits. 

Since our managing agent's site representative is supposed to do a walk through of the property on a periodic basis, would this imply that proper eyeball inspections of the wall had not been done, and would it also imply that needed licensed inspectors should have been periodically used to inspect this critical part of the co-op's physical infrastructure?

I feel that "Best Practices" should always be used by managing agents in the course of business.  Once NYC established a 5 year cycle for inspection, wouldn't this define a "Best Practice" for our managing agent to see that our retaining wall is inspected on a regular basis?  I would hope so.

More to come as things become public....
 

 

And now, on to happier things...

  As much as I'd like to show my readers a picture of RQS smiling in this blog, I will not do so because of what once happened with some...